Terafab aims 2nm chips by 2027
- Social posts outline a proposed Terafab AI complex in Texas — a 5.2 million sq ft Tesla/SpaceX/xAI JV aimed at mass AI chip fab capacity and in-house silicon. (x.com) - Leaks claim the campus is targeting 2nm production by 2027, 1 terawatt of annual AI compute, and an Intel 14A licensing arrangement tied to large-dollar commitments. (x.com 1) (x.com 2) - The plan signals aggressive vertical integration of design, fabrication, and AI compute by Musk-linked firms if the social leaks prove accurate. (x.com)